Liddell Power Station Sedimentation Basin

AGL Macquarie
  • >39,000M3Earthworks
  • >9,700M3Contaminated sludge removal
  • 2,300Total work hours
  • 35,000M3 Water storage capacity
  • Materials Solution Management
  • Geotechnical Analysis & Surveying
  • Bulk & Detailed Earthworks
  • Onsite Tipping & Stockpile Management
  • Water Diversion & Run Off Controls
  • Enviro Controls & Monitoring
  • Backfilling & Compaction
  • Contouring & Drainage
  • Site Dewatering
  • Construction of a new sediment basin designed to provide a total water storage capacity of approximately 35,000m3
  • Installation of two swale drains and an overflow system connected to Lake Liddell to manage excess flows
  • Oil and Grit Trap cleaned and cleared of contaminated sludge to restore its operational capacity
  • Volume of contaminated sludge significantly exceeded initial scope/expectations. Geotextile dewatering tube solution introduced to reduce overall volume prior to bulk load out and onsite capping and containment
  • Sequencing of Oil & Grit Trap cleaning in parallel with basin works to maintain operational capacity and reduce environmental risks during (concurrent) demolition works
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects