Kurri Kurri Aluminium Smelter

Hydro Australia
  • >150,000Total workhours
  • 220,000TConcrete crushed, screened & recycled onsite
  • 60,000TScrap steel recycled
  • 50,000TAsbestos contaminated soil remediated
  • Temp Works Engineering
  • Enviro Controls & Monitoring
  • Manual Demolition
  • Mechanical Demolition
  • Cut & Lift Demolition
  • Explosive Demolition
  • Steel Recycling
  • Bulk & Detailed Earthworks
  • Onsite Tipping & Stockpile Management
  • Haul Road Construction & Maintenance
  • Water Diversion & Run Off Controls
  • Capping & Containment
  • Backfilling & Compaction
  • Contouring & Drainage
  • Site Establishment
  • Strip Out
  • Asbestos Removal
  • Induced Collapse
  • Demolition of smelter infrastructure – 2.2km of Potline plant and buildings to ground level or top of plinth or slab level
  • Explosive demolition of three concrete stacks and one water tower, including removal of all slabs, retaining structures, plinths, foundations, roads, footpaths and services down to 1.5m below existing ground level
  • Onsite concrete crushing and screening
  • Asbestos and hazardous waste removal, including asbestos contaminated soil abatement
  • Bulk and detailed earthworks, backfilling and compaction, and contourworks associated with profiling the final landform into a free-draining site
  • Asset recovery and salvage of nominated plant or equipment – 10,000t of aluminium busbar beneath the potline suspended slab, including anode and cathode flexes
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects
  • DELTA Group - Projects