Baal Bone Colliery
Glencore
>50,000
Total workhours
1,000,000M3
Earthworks – shape, haul, move, push
22Ha
Native & grassland seeding
14Ha
Scarification of powerpole easement
Temp Works Engineering
Manual Demolition
Mechanical Demolition
Cut & Lift Demolition
Explosive Demolition
Concrete Recycling
Steel Recycling
Waste Transfer
Geotechnical Analysis & Surveying
Bulk & Detailed Earthworks
Onsite Tipping & Stockpile Management
Water Diversion & Run Off Controls
Ground Improvement
Slope Stabilisation
Enviro Controls & Monitoring
Capping & Containment
Backfilling & Compaction
Site Dewatering
Site Establishment
Strip Out
Asbestos Removal
Induced Collapse
Unique Attributes
Deployment of drone Geotech surveying to quantify work progress and outputs
Use of GPS enabled heavy earthmoving equipment to optimise programming and sequencing
Multiple demolition methodologies employed for variety of structures – explosive, induced collapse, mechanical, cut-and-lift
Earthworks to reshape and contour landform to a design surface
Working within a live waterway to rehabilitate and re-establish natural creek flows
Key Challenges
Seeding and tube stock planting of native vegetation across more than 60Ha site footprint
Management of more than 3,000m3 of hydrocarbon contaminated soils
More than 50Ha of detailed earthworks and drainage – verification of quantities and design surface models
Vegetation clearing on overburden stockpiles and removal of (introduced) Pine trees – more than 10Ha of non-native vegetation cleared across site
Capping of Tailings Dam with 80,000m3 of CCR
×
←
→
Back to PROJECTS